ŠAVNIK – Solar Power Plant Dubrovsko & BESS

Golden Group is developing one of Montenegro’s largest renewable energy projects, combining a 195 MW AC solar photovoltaic power plant with a 200 MW / 400 MWh Battery Energy Storage System (BESS) in Dubrovsko, Šavnik Municipality.

The project covers approximately 275 hectares and includes a new 33/110 kV substation and a planned 6.3 km double-circuit 110 kV transmission line connecting the facility to the national electricity transmission network at Brezna.

Following approximately four years of intensive development, the project achieved a major milestone on 30 October 2026, when the building permit was obtained for the solar power plant, BESS and associated substation.

The project aims to contribute to Montenegro’s renewable energy transition by combining large-scale clean electricity generation with advanced energy storage and enhanced power system flexibility.

Location:
Dubrovsko, Šavnik Municipality, Montenegro
Site Area:
275 ha
Development function:
Solar Power Plant & Battery Energy Storage System
Solar PV capacity:
195 MW AC / 220 MWp DC
Battery Energy Storage System:
200 MW / 400 MWh
Substation:
33/110 kV Dubrovsko
Grid connection:
2 × 110 kV OHL, approximately 6.3 km to SS Brezna
Status:
Building permit obtained for PV, BESS and substation (October 2026)
Project Company (SPV):
Sunrise Europe LLC, Kotor

Date:

Category: